The City of Twin Falls will conduct a geotechnical field investigation for the Canyon Rim Drop Line Final Design Project near the intersection of Canyon Rim Road and Park View Drive. The work will help the City gather information about soil, rock, and subsurface conditions along the proposed project alignment.
The investigation will include exploratory test pits along the talus slope below the canyon rim and geotechnical borings on the canyon rim, including areas near the proposed diversion, drop, and energy-dissipation structures. The information collected will support final engineering design and help identify appropriate construction methods for the future Canyon Rim Drop Line project.
Work is anticipated to occur starting November 23 through December 4, subject to weather, site access, and equipment availability. Residents and visitors may see crews, drilling equipment, excavation equipment, and support vehicles in the project area.
This work is investigative only and is not the start of project construction. Temporary noise, equipment activity, and limited short-term access adjustments may occur near active work areas. The City and its contractors will take appropriate measures to maintain site safety and minimize disturbance. Test locations will be documented and restored as appropriate following the investigation.
For safety, please stay clear of crews, equipment, and marked work areas.
This content is sourced from
City of Twin Falls
. It reflects the author's views and has not been edited by our newsroom. It may have been generated using AI assistance.